Back
3D render of the drive train yoke

    LT999-1 Lifting Yoke for Drive Train

    Siemens 2,3 MW

    The lifting system has been developed to lift and install a drive train on a Siemens 2.3 MW wind turbine. The lifting yoke is attached to all four lifting lugs on the gear box – via two boogie beams – and on the bolt holes of the main shaft flange. The system is lifted by three slings, two in the rear end and one in the front. At the front sling, a chain hoist ensures the ability to adjust the orientation of the system.

    Highlights
    • Peak wind velocity 12 m/s
    • WLL 38,000 kg