    LT999-1 Lifting Yoke for Drive Train

    Siemens 2.3 MW

    This lifting system has been developed to lift and install the drive train on the Siemens 2.3 MW wind turbine. The lifting yoke is attached to all four lifting lugs on the gearbox – via two boogie beams – and on the bolt holes of the main shaft flange. The system is lifted by three slings, two in the rear end and one in the front. At the front sling, a chain hoist ensures the ability to adjust the orientation of the system.

    Highlights
    • Peak wind velocity: 12 m/s
    • WLL: 38 t