Back
Transport frame lifting wind turbine tower

    LT325 Transport Frame 5MW Tower

    Transport of sections on both ship and lorry.

    Transport frame 5MW tower sections.  Furthermore the frame system is used as lifting equipment during erection on site of the 5MW tower.

    Highlights
    • WLL: 220 ton.
    • 140 ton (when used during transport with transport adapter mounted).