Transport frame lifting wind turbine tower

    LT325 Tower Transport Frame

    For 5 MW tower on both ship and lorry

    Transport frame for 5 MW tower sections.  The frame system is used as lifting equipment during erection on-site of the 5 MW tower.

    Highlights
    • WLL: 220 t.
    • When used during transportation with transport adapter mounted: 140 t.