English Español 中文
image of Liftra

LT928-1 Main Shaft Fixture
SENVION (REPOWER) MM82 & MM92 (2 MW)

Fix the rotor in place to reduce costs when changing gearboxes. The main shaft fixture can be assembled with the turbine crane without an external main crane and without dismantling the rotor. As a result, the required capacity of the main crane is significantly lower, since it has to only lift the gearboxes. All Liftra main shaft fixtures are equipped ejector systems that slide the gearbox clear of the main shaft with a force of up to 30 tons

    Highlights

  • Save time
  • Save rotor lowering costs
  • Minimize risks
  • Work in higher wind velocities
  • Assemble the fixture inside the nacelle
  • Ejector system automatically slides off the gearbox